搜索
热搜: 2017 报名 讲座
查看: 2340|回复: 3
打印 上一主题 下一主题

[转帖]方寸间领悟天地通灵——“维苏威火岩”系列赏

[复制链接]

0

主题

12

帖子

792

积分

新手上路

Rank: 1

积分
792
楼主
发表于 2010-2-26 20:03:00 | 显示全部楼层

The platform is fitted with a load sensor (Fig.A-3.) which measures the static load upon the platform. The electronic unit of this overload device is mounted in the control box door (fig.A-7). The overload device indicates when the platform is overloaded. If the load upon the platform (incl. platform elements, drive unit, fences) exceeds the load level of the HC program number, the static overload device will be activated. If the static overload device has been activated,the motors cannot be switched-on. By removing a part of the load the machine will be restored to operation.

When the platform is loaded to 90% of capacity, the light on top of the control box starts to burn.

When the platform is loaded to 100% of capacity, the light on top of the control box will burn and a buzzer will sound. In this situation the machine will stop and can not be operated further until the excessive load is removed.

[URL=http://www.wellbridal.com]wedding dress[/URL] [URL=http://www.wellbridal.com]wedding dresses[/URL]
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

0792-8586998

总统家客服热线
周一至周日:08:00-22:00

总统家微信

©2014  九江总统家文化传媒有限公司. All rights reserved. ( 赣ICP备17005700号-1 )  Powered by Discuz! X3.2  技术支持:总统家